
Beni-Jomsom-Korala road set to reopen Monday after flood damage
FROM THE PUBLISHER
Track opened on the damaged section of the Beni-Jomsom-Korala road. Myagdi, October 9 The Beni-Jomsom-Korala road, a key route linking Nepal’s only currently operational border crossing with China, is expected to reopen to traffic on Monday after extensive repairs following floods and landslides, although challenges remain in ensuring safe and smooth travel. The 202-kilometre road, which runs from Maldhunga in Parbat through Myagdi to the Korala border point in Mustang, was severely damaged by floods…
Original reporting by Onlinekhabar English. Some articles may require a subscription.